Data Center Construction
TAI A.Ş. operates in the end-to-end supply, installation, commissioning and delivery of all systems and products in the construction of a data center.
Data center projects; Managing stages such as administrative, technical, logistics, coordination, legal responsibilities and financial processes from a single center will provide speed and provide advantages in quality and cost issues.
About Details
Within the scope of data center construction and architectural works; Soil survey, site selection studies, construction of reinforced concrete or steel data center buildings, foundation and concrete applications, wall and roof works, floor covering, floor arrangement works, raised flooring, suspended ceiling applications, doors, windows, exterior applications , insulation works, metal platforms and supports, landscaping works, epoxy, paint and decorations, movable and immobile furniture applications, secondary road construction.
Within the scope of data center electrical works; Bringing and distributing energy, high voltage works, low voltage panels, transformer system, generator and fuel system, uninterruptible power supply, grounding systems, energy cabling, busbar applications, cable routes, lighting and socket systems, automatic transfer systems, elevator systems, energy quality systems, solar panel applications, card access and physical security systems, closed circuit camera system, fire alarm system, emergency announcement system, emergency guidance systems, burglar alarm and parking lot guidance systems, TV system, cabinets and applications, Systems such as structured cabling systems, in-cab energy distribution system, cooling and building automation system (BMS), energy automation system (PMS) and data center infrastructure software (DCIM).
Within the scope of data center mechanical works; Cooling and heating system end-to-end installation, fire fighting systems, ventilation systems, plumbing system, water tanks, pump systems, drainage and waste removal systems, fresh air plants and filters, natural gas systems, liquid leak detection system systems such as water softening and conditioning systems.
TAI A.Ş. accepts as a basic principle to complete all the above-mentioned systems under a single roof, independently of the manufacturer, with the technologies that best suit the requirements of the customer and the project.
Within the scope of data center electrical works; Bringing and distributing energy, high voltage works, low voltage panels, transformer system, generator and fuel system, uninterruptible power supply, grounding systems, energy cabling, busbar applications, cable routes, lighting and socket systems, automatic transfer systems, elevator systems, energy quality systems, solar panel applications, card access and physical security systems, closed circuit camera system, fire alarm system, emergency announcement system, emergency guidance systems, burglar alarm and parking lot guidance systems, TV system, cabinets and applications, Systems such as structured cabling systems, in-cab energy distribution system, cooling and building automation system (BMS), energy automation system (PMS) and data center infrastructure software (DCIM).
Within the scope of data center mechanical works; Cooling and heating system end-to-end installation, fire fighting systems, ventilation systems, plumbing system, water tanks, pump systems, drainage and waste removal systems, fresh air plants and filters, natural gas systems, liquid leak detection system systems such as water softening and conditioning systems.
TAI A.Ş. accepts as a basic principle to complete all the above-mentioned systems under a single roof, independently of the manufacturer, with the technologies that best suit the requirements of the customer and the project.
